CHAPTER ONE General Survey
Objectives
1.1 Thecnical Background
1.2 SHP Development
Environmental Issues
Questions for Discussion
CHAPTER TWO Small Hydropower Exploitation and Small River Planning
Objectives
2.1 Fundamental Theory of small Hydropower Generation
2.2 Exploitation Schemes of Small Hydropower
2.3 Comprehensive Exploitation and Utilization of Water Resources of Small Rivers
2.4 Small River Planning and Cascade Development
Self-assessnebt Qyestuins
CHARPTER THREE Hydrology and Hydroenergy Design
Objectives
3.1 Hydrology Design in SHP Development
3.2 Data Preparation
3.3 Outcome Requirements
3.4 Design Runoff
3.5 Developing Daily Flow-duration Curve
3.6 Low-water Analysis
3.7 Design Flood
3.8 Water Level-discharge Relation Curve
3.9 Case Studies
3.10 Hydroenergy Design
Self-assessnebt Qyestuins
CHAPTER FOUR Geologic problems in Small Hydros
Objectives
General
4.1 Characteristics of Small Hydros
4.2 Slope Stability and Its Field Investigation
4.3 Earthquakes
4.4 Engineering Measures for Strengthening Slopes
4.5 Some Recommendations
Self-assessnebt Qyestuins
CHAPTER FIVE Civil Works of Small Hydros
CHAPTER SIX Small Hydraulic Turbine and ITS Auxiliary
CHAPTER SEVEN Electrical System of a Small Hydropower Station
CHAPTER EIGHT Compter Application in SHP Station
CHAPTER NINE Economic and Fiancial Apprasisal
Appendix
SPECIAL TOPIC 1 Idas for Operating Small Hydropower Plants Cost-effectively
SPECIAL TOPIC 2 Small Hydropower Contributes to Poverty Reduction and Rural Integrated Development in China
SPECIAL TOPIC 3 Private Participation in Small Hydropower Development
SPECIAL TOPIC 4 Small Hydropower Development and Environment Protection
SPECIAL TOPIC 5 Prototype Efficiency Test for Unit and Technical Refurbishment of Hydropower Station