注册 | 登录读书好,好读书,读好书!
读书网-DuShu.com
当前位置: 首页出版图书科学技术工业技术建筑科学工具书/标准铁路建设项目工程试验室管理标准(Q\CR9204-2015 英文版)

铁路建设项目工程试验室管理标准(Q\CR9204-2015 英文版)

铁路建设项目工程试验室管理标准(Q\CR9204-2015 英文版)

定 价:¥300.00

作 者: 中国铁路总公司
出版社: 中国铁道出版社
丛编项:
标 签: 暂缺

购买这本书可以去


ISBN: 9787113211455 出版时间: 2016-04-01 包装:
开本: 16开 页数: 26 字数:  

内容简介

  This Standard is formulated to unify the standards for managing engineering laboratories of railway construction projects and to ensure the quality of testing.This Standard is applicable to the management of engineering laboratories of railway construction projectsEngineering laboratories of railway construction projects shall be set up in accordance with the scale, features and work items of the project and built in accordance with the principles of advancement, reliability, economy and practicality. The configuration shall be reasonable and the management shall be in order, so as to meet the needs of controlling construction quality, as well as standardized and informatized management.Engineering laboratories for railway construction projects shall establish and improve quality system to ensure authenticity and accuracy of testing data.In addition to this Standard, testing management of railway construction projects shall comply with the provisions of the relevant national, industry standards and those issued by China Railway Corporation.

作者简介

暂缺《铁路建设项目工程试验室管理标准(Q\CR9204-2015 英文版)》作者简介

图书目录

1 General Provisions
2 Basic Requirements
3 Testing Management of the Client
4 Laboratory of the Contractor
4.1 Laboratory Arrangement
4.2 Work Responsibilities and Management Requirements
4.3 Testing Personnel
4.4 Instruments and Equipment Configuration and Environmental Conditions for Facilities
4.5 Management System
5 Laboratory of the Supervision Firm
5.1 Laboratory Arrangement
5.2 Work Responsibilities and Management Requirements
5.3 Testing Personnel
5.4 Instruments and Equipment Configuration and Environmental Conditions for Facilities
5.5 Management System
Appendix A Confirmation Procedure of the Laboratory Working Conditions
Appendix B Format of Application Form for Confirnung Laboratory Working Conditions
Appendix C Items Form for Confirming Laboratory Working Conditions
Appendix D Main Testing Items in Central Laboratory of the Contractor
Appendix E Main Testing Items in Branch Laboratory
Appendix F Testing Items in Laboratory of Beam Prefabrication Yard or Sleeper (Slab) Prefabrication Yard
Appendix G Reference Table on Laboratory Main Equipment Configuration
Appendix H Lists of Laboratory Environment Temperature and Humidity Control
Explanation of Wording in this Standard

本目录推荐