I General
1 General Provisions
2 Terms
II Construction
3 Basic Requirements
3.1 General Requirements
3.2 Client
3.3 Designlnstitute
3.4 Contractor
3.5 Supervision Firm
4 Construction Preparation
4.1 Construction Investigation
4.2 Shop Drawing Check
4.3 Scheme Selection and Resource Allocation for Construction
4.4 Construction Operation Guide
4.5 Construction Technical Instructions
5 Optical and Electrical Cable Line
5.1 GeneralRequirements
5.2 Route Resurveying
5.3 Inspection,Allocation and Transportation of Single Drum Cable
5.4 Cable Laying
5.5 CableProtection
5.6 CableSplicing
5.7 Cable Lead-in
5.8 CableTerminating
6 OutdoorEquipment
6.1 General Requirements
6.2 Field Data Acquisition Equipment of Wind Velocity and Direction
6.3 Rainfall Field Data Acquisition Equipment
6.4 Snow Depth Field Data Acquisition Equipment
6.5 Foreign Object Intrusion Field Data Acquisition Equipment
6.6 Earthquake Field Data Acquisition Equipment
6.7 Lightning Protection and Earthing of Outdoor Equipment
7 Indoor Equipment
7.1 General Requirements
7.2 CabinetEquipment
7.3 Terminal Equipment
7.4 Power Supply Equipment
7.5 IndoorWiring
7.6 Lightning Protection and Earthing of Indoor Equipment
8 SystemDebugging
8.1 General Requirements
8.2 Standalone Debugging
8.3 Individual Debugging
8.4 System Functions and Performance Debugging
III Acceptance
9 BasicRequirements
9.1 General Requirements
9.2 Division of Acceptance Units
9.3 Contents and Requirements of Acceptance
9.4 Acceptance Procedure and Organizing
10 Optical and Electrical Cable Line
10.1 General Requirements
10.2 CableLaying
10.3 CableProtection
10.4 CableSplicing
10.5 CableLead-in
10.6 CableTerminating
11 OutdoorEquipment
11.1 General Requirements
11.2 Field Acquisition Equipment of Wind Velocity and Direction
11.3 Rainfall Field Data Acquisition Equipment
11.4 Snow Depth Field Data Acquisition Equipment
11.5 Foreign Object Intrusion Field Data Acquisition Equipment
11.6 Earthquake Field Data Acquisition Equipment
11.7 Lightning Protection and Earthing of Outdoor Equipment
12 IndoorEquipment
12.1 General Requirements
12.2 Cabinet Equipment
12.3 Terminal Equipment
12.4 Power Supply Equipment
12.5 Indoor Wiring
12.6 Lightning Protection and Earthing of Indoor Equipment
13 Systemlnspection
13.1 General Requirements
13.2 Standalone Inspection
13.3 Individuallnspection
13.4 System Inspection of Function and Performance
14 Overall Quality Assessment of Unit Works
14.1 General Requirements
14.2 Inspection of oc Documents of Unit Works
14.3 Inspection of Construction Quality and Main Functions of Unit Works
14.4 Assessment of Appearance Quality of Unit Works
15 Engineering Acceptance
15.1 Unit Works Acceptance
15.2 Static Acceptance
15.3 Dynamic Acceptance
Appendix A Frequently Used Instrument for Railway Natural Disaster and Foreign Object Intrusion Monitoring System
Appendix B Inspection Record of Cables for Railway Natural Disaster and Foreign Object Intrusion Monitoring System
Appendix C Check Record of Structure Gauge for Equipment of Railway Natural Disaster and Foreign Object Intrusion Monitoring System
Appendix D Foreign Object Intrusion Monitoring Inspection Record of Railway Natural Disaster and Foreign Object Intrusion Monitoring System
Appendix E Site Construction Quality Management and Check Record of Railway Natural Disaster and Foreign Object Intrusion Monitoring System
Appendix F Site Construction Quality Acceptance Record of Railway Natural Disaster and Foreign Object Intrusion Monitoring System
Appendix G Inspection Record of Railway Natural Disaster and Foreign Object Intrusion Monitoring System
Appendix H Standalone Inspection Record of Railway Natural Disaster and Foreign Object Intrusion Monitoring System
Appendix J Individual Inspection Record of Railway Natural Disaster and Foreign Object Intrusion Monitoring System
Appendix K Verification and Check Table of Unit Works of Railway Natural Disaster and Foreign Object Intrusion Monitoring System Explanation of Wording in this Standard