目录
Contents
前言
Preface
1 变电检修基本技能
Chapter 1 Basic transformer maintenance skills 1
1.1 绳索打结
Section 1.1 Rope knot 1
1.1.1 麻绳的用途和种类 The use and type of hemp rope 1
1.1.2 常见绳结举例 Examples of common knots 3
1.2 高处作业
Section 1.2 Work at heights 7
1.2.1 高处作业相关基本概念 Basic concepts related to work at heights 7
1.2.2 高处作业的分类与分级 Classification and grading of work
at heights 8
1.2.3 高处作业的注意事项 Points for attention of work at heights 10
1.3 紧急救护
Section 1.3 Emergency rescue 12
1.3.1 紧急救护的基本要求 Basic requirements for emergency rescue 12
1.3.2 紧急救护的通用技能 General skills for first aid 12
1.3.3 骨折紧急救护 Fracture emergency care 17
1.3.4 烧伤紧急救护 Burn first aid 18
1.3.5 动物咬伤紧急救护 Animal bite first aid 18
1.3.6 高处坠落紧急救护 Falling accidents emergency rescue 19
1.3.7 中暑紧急救护 Emergency treatment for heatstroke 20
2 故障检测技术
Chapter 2 Fault examining technology 22
2.1 氧化锌避雷器直流1mA 电压(U1mA)及0.75U1mA 下的泄漏电流测试
Section 2.1 Leakage current test of zinc oxide arrester under DC
1mA Voltage(U1mA) and 0.75U1mA 22
2.1.1 工作任务 Work task 22
2.1.2 引用文件 Referenced files 22
2.1.3 天气及作业现场要求 Weather and job site requirements 23
2.1.4 准备工作 Preparatory work 23
2.1.5 作业程序 Procedures 30
2.1.6 相关知识 Relevant knowledge 39
2.2 SF6 气体充放、回收和检漏
Section 2.2 Charge, discharge, recovery and leak detection
of SF6 gas 43
2.2.1 工作任务 Work tasks 43
2.2.2 引用的规程规范 Referenced code of practice 43
2.2.3 天气及作业现场要求 Weather and job site requirements 44
2.2.4 作业前准备 Preparation before operation 44
2.2.5 作业程序 Procedure 46
2.2.6 相关知识 Relevant knowledge 58
2.3 电气设备红外热像测温
Section 2.3 Infrared thermal image temperature measurement of
electrical equipment 61
2.3.1 工作任务 Work tasks 61
2.3.2 引用文件 Referenced files 62
2.3.3 天气及作业现场要求 Weather and job site requirements 62
2.3.4 准备工作 Preparatory work 63
2.3.5 作业程序 Procedures 65
2.3.6 开展本工作的相关附件 Relevant annexes for
carrying out this work 74
2.3.7 相关知识 Relevant knowledge 80
3 故障处理技术
Chapter 3 Practical fault operation technology 90
3.1 油浸式TA 检查及缺陷处理
Section 3.1 Oi-l immersed TA inspection and defect treatment 90
3.1.1 工作任务 Work tasks 90
3.1.2 引用文件 Referenced file 90
3.1.3 天气及作业现场要求 Weather and job site requirements 90
3.1.4 准备工作 Preparatory work 91
3.1.5 作业程序 Procedure 95
3.1.6 相关知识 Relevant knowledge 102
3.2 ZN12-40.5 真空断路器灭弧室更换及调试
Section 3.2 ZN12-40.5 vacuum circuit breaker arcing chamber
replacement and commissioning 119
3.2.1 工作任务 Work tasks 119
3.2.2 引用文件 The reference file 119
3.2.3 天气及作业现场要求 Weather and job site requirements 120
3.2.4 准备工作 Preparation 120
3.2.5 作业程序 Procedure 124
3.2.6 开展本工作的相关附件 Relevant attachments to
carry out the work 133
3.2.7 相关知识 Related knowledge 137